Development of a Simplified Mathematical Modelling for the Job Shop Scheduling to Calculate Makespan

Autores

  • M. S. Kagthara Department of Mechanical Engineering, Atmiya Institute of Technology and Science, Rajkot, Gujarat, India
  • M. G. Bhatt Department of Mechanical Engineering, S.S. Engineering College, Bhavanagar, Gujarat, India

Palavras-chave:

Job-Shop Scheduling, Mathematical modeling, Gantt chart, Makspan

Resumo

In this paper, mathematical modelling is prepared for job shop scheduling problem. Makespan is calculated using maximum machine time. Matlab algorithm is developed for mathematical modelling. Formula is tested using various case studies. Gantt chart is prepared for graphical representation of solution. Results have been verified for mathematical modelling using Gantt chart approach.Cite this ArticleKagthara MS, Bhatt MG. Developmentof a Simplified Mathematical Modellingfor the Job Shop Scheduling to CalculateMakespan. Journal of ProductionResearch and Management. 2017; 7(1):22–25p.

Biografia do Autor

  • M. S. Kagthara, Department of Mechanical Engineering, Atmiya Institute of Technology and Science, Rajkot, Gujarat, India
    Mechanical Engineering Department

Publicado

2017-05-19

Edição

Secção

Research Articles