Spring til hovedindhold Spring til hovednavigations-menu Spring til bundtekst
Journal of Construction Engineering, Technology & Management
  • Current
  • Archives
  • Announcements
  • About
    • About the Journal
    • Submissions
    • Editorial Masthead
    • Privacy Statement
    • Contact
Søg
  • Register
  • Login
  1. Startside /
  2. Arkiver /
  3. Årg. 4 Nr. 2 (2014)

Årg. 4 Nr. 2 (2014)

					Se Årg. 4 Nr. 2 (2014)
Publiceret: 2014-07-03

Research Articles

  • Cost Objective Model for Construction Equipment Replacement Policies

    Raji Al-Ani, Annas Al-Saadie
    1-13
    • Abonnementsadgang PDF (engelsk) (USD 20)
  • Safety Issues with Tower Crane and Remedial Measures

    P. S. Gandhak, Rahul Wankhade
    14-21
    • Abonnementsadgang PDF (engelsk) (USD 20)
  • Water Permeability of Hybrid Steel Fiber Reinforced Concrete

    M P Singh, S P Singh, A P Singh
    30-37
    • Abonnementsadgang PDF (engelsk) (USD 20)

Review Articles

  • Stakeholder’s Perception of the Causes and Effects of Construction Delays on Project Delivery: A Review

    P. S. Gandhak, Syed. Sabihuddin
    22-29
    • Abonnementsadgang PDF (engelsk) (USD 20)

Short Articles

  • The Role of Cost Estimation/Tendering in Engineering Projects in Nigeria

    George N. Osaghae
    38-42
    • Abonnementsadgang PDF (engelsk) (USD 20)

Udviklet af

Open Journal Systems

Abonnement

Login for at få adgang til ressourcer, der kun er for abonnenter.

Sprog

  • čeština
  • dansk
  • Deutsch
  • English
  • español
  • français
  • italiano
  • 日本語
  • português
  • русский
  • 中文

Information

  • Til læsere
  • Til forfattere
  • Til bibliotekarer
Mere information om dette publiceringssystem, platform og workflow fra OJS/PKP.